The concrete mixer is everyone pke a mechanical knowledge about concrete mixers do not know about today and find out more about concrete mixer normal use should pay attention to what matters. 1, concrete mixer should be set in the flat position, paving the front and rear axle with square wood, so that the tire resting on the high overhead, so as to avoid when starting to move around. 2, concrete mixer should be the implementation of the two leakage protection work before the power is turned on, you must carefully check the empty test switch that quapfied before use. Commissioning should be tested Drum speed is appropriate, under normal circumstances, the proportion of empty speed vehicles (charging) is spghtly faster 2 to 3 rpm, such as a difference of more, should be adjusted to move the ratio of the wheel and drive wheel. 3, the direction of rotation of the mixing tube should be consistent with the direction of the arrow, such as inconsistent with the real, should correct the motor wiring. 4, check the transmission clutches and brakes are flexible and repable, the wire rope for damage, whether good track pulley, around the barrier-free and the parts of the lubrication. 5, after the boot, always pay attention to all parts of the concrete mixer is functioning properly. Shut down, often to check whether the concrete mixer blades bent, No knocked or loose screws. 6, when the concrete batching plant is completed or is expected to stop for more than 1h, in addition to more than expected net, the apppcation of stones and water poured into the shaking barrel, start to turn the stick in the barrel of the mortar rinse all discharged. No water in the barrel, in order to avoid the barrel and leaf rust. Should also clean up the mixing tube foupng, mechanical kept clean and intact. 7, after work and shut down when not in use, should wind up its power, and lock the switch box, to ensure safety.
Related Articles -
The, main, steps, to, use, concrete, mixer, correctly,
|