The sand attention of installation and use the machine by xing qing
|
|
|
The sand attention of installation and use the machine |
|
|
|
Blogs,Business
|
|
sand machine belong to heavy equipment, its installation and use all will need a certain rules and instructions. In the installation of book is so used, let's take a look at the installation use need to pay attention to which contents: one, the sand machine installation in concrete foundation, should bear based several times of the weight. According to the sand to different can be installed on the airport factory in homework or installed outside work. When installation should be the leveling of the sand machine vertical spindle and level. System should be installed on the sand party hoisting equipment, hoisting equipment according to the weight of sand machine maximum weight consideration, on the sand should be left on party hoisting space, on the sand machine side should stay the appropriate space for testing use. Two, on the sand on site installation should still after checking. Whether to check the oil tube connecting firm, with two former should add a heavy oil, add mobil vehicle lubrication super or 3 # lithium base fat. Check whether the oil tube, parts of connecting firm, carefully check whether there is foreign body impeller. Three, check motor between belt, and now the point start motor, XuanXiangYing and the sand machine sign direction, with signs if in opposite directions, should be adjusted motor connection, make its spin to sign and consistent, forbidden ways. Double motor drive, spindle assembly and two side motor, the wind don't have the same number of spindle assembly and v-belts are linked together, the corresponding adjustment should be flat. After examination and reproduction, before production, first of all, empty load startup and commissioning make sure no problem by the official production. Four, average machine turn empty load operation time for four hours, load test run into the grain-size strictly according to various models specifications, greater than the provisions are strictly prohibited materials into; Even feed to continuous, water content not less than 10-15% (according to different materials), feeding achieve PCL direct impact of the full load of sand machine so far; Load test run time 8-24 hours five, the sand on machine before check whether does door eddy current cavity observation, in order to prevent the material from eddy current cavity observation rushed out of the door, produce risk. Check the impeller and transport equipments startup sequence for: 1, discharging-- the sand machine- feeding 2, the sand machine must be no-load start, DaiZhi sand machine working normally rear can feeding. 3, stop order and boot instead. Six, the sand machine into the grain-size strictly according to regulations, it is strictly prohibited to greater than the provisions in the sand material machine, otherwise, can cause the imbalance of the impeller sand machine and impeller excessive wear, even cause congestion impeller channel and center into the feed tube, make the sand machine can not work normally, which found that material should be ruled out. Seven, the host machine stop before work sand, should first stop feeding, otherwise it will cause killed impeller and burned the motor. Feeding should be spread evenly. The sand machine in the process of operation, and may not have severe vibration and abnormal noise, otherwise, should stop check. Lubrication oil lubrication methods for dry, the mobil vehicle a grease or # 3 lithium base fat. The sand machine work 100 hours every add appropriate grease. Usually, the sand the use of machine of the above attention can be, also only by following the use of sand machine rules made homework, to ensure that the service life of the machine of sand, and the quality of their products, even is the personal safety economic loss.">The sand machine belong to heavy equipment, its installation and use all will need a certain rules and instructions. In the installation of book is so used, let's take a look at the installation use need to pay attention to which contents: one, the sand machine installation in concrete foundation, should bear based several times of the weight. According to the sand to different can be installed on the airport factory in homework or installed outside work. When installation should be the leveling of the sand machine vertical spindle and level. System should be installed on the sand party hoisting equipment, hoisting equipment according to the weight of sand machine maximum weight consideration, on the sand should be left on party hoisting space, on the sand machine side should stay the appropriate space for testing use. Two, on the sand on site installation should still after checking. Whether to check the oil tube connecting firm, with two former should add a heavy oil, add mobil vehicle lubrication super or 3 # lithium base fat. Check whether the oil tube, parts of connecting firm, carefully check whether there is foreign body impeller. Three, check motor between belt, and now the point start motor, XuanXiangYing and the sand machine sign direction, with signs if in opposite directions, should be adjusted motor connection, make its spin to sign and consistent, forbidden ways. Double motor drive, spindle assembly and two side motor, the wind don't have the same number of spindle assembly and v-belts are linked together, the corresponding adjustment should be flat. After examination and reproduction, before production, first of all, empty load startup and commissioning make sure no problem by the official production. Four, average machine turn empty load operation time for four hours, load test run into the grain-size strictly according to various models specifications, greater than the provisions are strictly prohibited materials into; Even feed to continuous, water content not less than 10-15% (according to different materials), feeding achieve PCL direct impact of the full load of sand machine so far; Load test run time 8-24 hours five, the sand on machine before check whether does door eddy current cavity observation, in order to prevent the material from eddy current cavity observation rushed out of the door, produce risk. Check the impeller and transport equipments startup sequence for: 1, discharging-- the sand machine- feeding 2, the sand machine must be no-load start, DaiZhi sand machine working normally rear can feeding. 3, stop order and boot instead. Six, the sand machine into the grain-size strictly according to regulations, it is strictly prohibited to greater than the provisions in the sand material machine, otherwise, can cause the imbalance of the impeller sand machine and impeller excessive wear, even cause congestion impeller channel and center into the feed tube, make the sand machine can not work normally, which found that material should be ruled out. Seven, the host machine stop before work sand, should first stop feeding, otherwise it will cause killed impeller and burned the motor. Feeding should be spread evenly. The sand machine in the process of operation, and may not have severe vibration and abnormal noise, otherwise, should stop check. Lubrication oil lubrication methods for dry, the mobil vehicle a grease or # 3 lithium base fat. The sand machine work 100 hours every add appropriate grease. Usually, the sand the use of machine of the above attention can be, also only by following the use of sand machine rules made homework, to ensure that the service life of the machine of sand, and the quality of their products, even is the personal safety economic loss.
Related Articles -
sand,
|
Rate This Article |
|
|
|
Do you Agree or Disagree? Have a Comment? POST IT!
Reader Opinions |
|
|
|
|