Asphalt flat roofs very popular among homeowners however they are vulnerable where sharp angles and comers are presented. These are even found where the timber substructure is designed to take asphalt but are very common where the original timber substructure was formerly covered with a metal that has become worn out and has since been re-covered with asphalt without any modification to take the new material. Thus in the case of some flat roofs, asphalt may have been taken over the sharp angles of box gutters or projections without much thought to the detailing below. This will have resulted in cracks appearing at the edges and the surveyor will notice how temperature changes have caused the cracks at such weak points to open. Finally in this investigation the Austin Roofing Contractor will make a note of any parts of the roof area where the asphalt is thin, either by being laid badly in the first place, or by excessive wear and tear. An example of this is often the detail at the eaves of a roof where the asphalt has been tapered down to a narrow edge which becomes frayed and fractured in the course of time. Although the initial hardening of asphalt is slow, it subsequently becomes hard and rigid and any movement in the substructure will cause tears. Asphalt therefore needs a firm base. If the asphalt to a flat roof is badly worn and there is a risk of water ponding on large areas, there will be little option but for the asphalt to be taken up and relaid. It is best for the surveyor to resist the temptation to use the present covering as a base for building up a new layer since stripping the defective roofing provides an opportunity not only to examine and if necessary improve the substructure, but also to put right awkward details that might reduce the life of the new roof covering. The opportunity can also be taken for a lining of insulating material to be provided if one was not present before. Once the roof covering is stripped the surveyor will be able to take the same steps to decide as to the suitability of the substructure as are described under the heading of lead flat roofs. If the boards are not satisfactory new 25mm boarding should be laid, nailed to the edge of each joist, the heads of the nails being well punched in. The boards should, of course, run in the same direction as the fall of the roof where possible and should preferably be tongued and grooved so that the individual boards do not curl. The selection of an insulating barrier will be one of choice but on the basis that the roof is boarded, some additional precautions are desirable before the underlay and asphalt is laid. It is important to choose the right Austin Roofing Contractor to get the work done effectively at reasonable rates. Roofing contractor is very important to install and repair the roofs of different materials. Reading the reviews provided by the author is one of the best ways to gain necessary information on Roofing Contractors Austin.
Related Articles -
Austin, Roofing, Contractor,
|