Hardwood flooring is a common and popular type of application found in many homes. A wood floor always seems to give a home a warm kind of feeling. With advancements and techniques, it is even possible to lay it over concrete. In this article, we will outline the steps necessary to lay your wood flooring over a concrete base. Tools / Materials Mineral Spirits ¼” Round Molding Tape Measure Saw Painter’s Tape Adhesive Hardwood Flooring Paint Roller Moisture Barrier Level & Sander Preparation Step 1 – Once you’ve purchased your wood, keep the materials in your home for a week’s time in order to allow them to acclimate to the home’s temperatures. Due to how the material expands and contracts, this will help eliminate added adjustments later on. Step 2 – Clean the treatment area making certain it is completely dry. Also keep in mind that the material cannot be placed on fresh concrete for a period of at least sixty days. Step 3 – Inspect the concrete for any high or rough spots. Using a sander, scale down any rough spots till they are level. Be sure to clean up any sand or dust left over. Step 4 – Using a paint roller, apply a moisture barrier. This is act to seal the concrete and give added protection to the wood. Allow to dry over sixteen hours. Installation Step 1 – Apply the adhesive to the floor, starting at the edge of the longest wall. Place the flooring directly to the adhesive, and press down. Step 2 – While you apply, use mineral spirits, dabbed on a rag to help remove excess adhesive from the surface. Step 3 – Be sure to leave a ¼” gap between the wall and the wood material. This is required for expansion and temperature changes. Step 4 – Use a simple painter’s tape and tape the boards together. This will work to keep the planks in place once they have been laid onto the surface area. Continue laying planks. Step 5 – Once you’ve completed placing all of your boards, walk around the entire home in order to make sure that each plank is stuck to the adhesive. Do not spend too much time in the room, and do not allow traffic in the area until a good twelve hours has passed. Step 6 – Once your adhesive has dried, nail the ¼” molding to the wall in order to cover the expansion joint. For hardwood flooring, Manhattan based experts provide the best service in the industry that includes quality workmanship that induces beautiful and long lasting results. To know more, visit http://www.ny-floorman.com
Related Articles -
floor, restoration,
|