The planning process fulfills four distinct purposes: • Identify activities – the work breakdown structure Most projects are too complex to be planned and controlled effectively unless they are first broken down into manageable portions. This is achieved by structuring the project into a ‘family tree’, along similar lines to the component structure, but which specifies major tasks or sub-projects. These in turn are divided up into smaller tasks until a defined, manageable series of tasks, called a work package, is arrived at. Each work package can be allocated its own objectives in terms of time, cost and quality. The output from this is called the work breakdown structure (WBS). The WBS brings clarity and definition to the project planning process. • Estimate times and resources The next stage in planning is to identify the time and resource requirements of the work packages. Without some idea of how long each part of a project will take and how many resources it will need, it is impossible to define what should be happening at any time during the execution of the project. Estimates are just that, however – a systematic best guess, not a perfect forecast of reality. Estimates may never be perfect but they can be made with some idea of how accurate they might be. • Identify relationships and dependencies All the activities which are identified as composing a project will have some relationship with one another that will depend on the logic of the project. Some activities will, by necessity, need to be executed in a particular order. For example, in the construction of a house, the foundations must be prepared before the walls are built, which in turn must be completed before the roof is put in place. These activities have a dependent or series relationship. Other activities do not have any such dependence on each other. The rear garden of the house could probably be prepared totally independently of the garage being built. These two activities have an independent or parallel relationship. • Identify schedule constraints Once estimates have been made of the time and effort involved in each activity, and their dependencies identified, it is possible to compare project requirements with the available resources. The finite nature of critical resources – such as special skills – means that they should be taken into account in the planning process. This often has the effect of highlighting the need for more detailed re-planning. • Fix the schedule Project planners should ideally have a number of alternatives to choose from. The one which best fits project objectives can then be chosen or developed. For example, it may be appropriate to examine both resource-limited and time-limited options. However, it is not always possible to examine several alternative schedules, especially in very large or very uncertain projects, as the computation could be prohibitive. However, modern computer-based project management software is making the search for the best schedule more feasible. This article has been compiled by Classof1.com; they offer operations management online homework help.
Related Articles -
Project, Planning,
|